Aerial view of Woodward Lofts under construction in Harrisburg

Harrisburg, Pennsylvania

A landmark taking shape in timber.

Follow the transformation of Woodward Lofts from an open neighborhood site to a four-story hybrid mass timber community.

Explore the construction story
Building system
Hybrid mass timber
Community
48 affordable homes
Current chapter
Fourth-floor construction

The project

From open ground to a new presence in Allison Hill.

Woodward Lofts is being documented as it is built. Repeated aerial paths, ground photography, and milestone films reveal the decisions, sequencing, and craft behind a highly coordinated construction process.

Why timber

Innovation you can see in the structure.

Prefabricated timber components turn months of modeling and coordination into precise, visible progress on site. The system reduces congestion while giving the building warmth, character, and a distinct architectural identity.

Mass timber stair and elevator towers rising at Woodward Lofts
Timber cores and wall systems begin defining the building.

Construction milestones

The building, chapter by chapter.

  1. 01July 6, 2025Pre-construction baseline
  2. 02Nov 18, 2025Groundbreaking
  3. 03May 7, 2026Slab-on-ground pour
  4. 04June 19, 2026Delivery
  5. 05July 16, 2026Vertical progress
  6. 06Aug 3, 2026Fourth-floor construction

July 6 + November 18, 2025

A place before the building.

A July 6 baseline establishes the scale of the site and its neighborhood edges. Groundbreaking on November 18 begins the construction story that will remain visible through every repeat flight.

Woodward Lofts site on groundbreaking day
Groundbreaking · November 18, 2025
Aerial view of the open Woodward Lofts site
Pre-construction baseline · July 6, 2025

May 7, 2026

The foundation becomes a floor.

A pre-dawn slab pour brings crews, sequencing, and site logistics into one frame. Ground coverage captures the work; the drone reveals the geometry.

Concrete crew working during the Woodward Lofts slab pour
Crew finishing the Woodward Lofts concrete slab
Aerial view of the completed Woodward Lofts slab
A complete site read after the pour.
Milestone film · 00:48The slab pour

From active placement to the finished foundation.

June 19, 2026

Timber arrives. The project changes pace.

The June 19 delivery brings prefabricated components, crane picks, and field crews together. Material moves directly from transport to placement as the building begins to read vertically.

Mass timber delivery and crane activity at Woodward Lofts
Mass timber delivery · June 19, 2026
Field film · 00:45Mass timber delivery

Material, equipment, and crews converging on site.

July 16, 2026

Going vertical.

Timber cores, wall panels, and floor systems stack the building level by level. Close aerials show the assembly; wide views keep the city and neighborhood in frame.

Woodward Lofts mass timber structure viewed along its full length
Top-down aerial of Woodward Lofts during vertical construction
Oblique aerial view of the Woodward Lofts timber structure
The building takes recognizable form.
Close view of mass timber towers and wall framing
Structure, connection, and sequence.

August 3, 2026 · Current chapter

The fourth floor takes shape.

Fourth-floor construction extends the building's massing and brings the full scale of the community into view. Repeated flights preserve a clear record of assembly, progress, and urban fit before roof installation begins.

Fourth-floor construction at Woodward Lofts in August 2026
Progress documented August 3, 2026
Top-down view of Woodward Lofts fourth-floor construction
Wide aerial placing Woodward Lofts in the Harrisburg city context
Progress film · 00:44August progress

The current structure from site level to city scale.

See the transformation

One site. Two moments.

Drag the marker to compare the open site with the structure documented in August 2026.

The Woodward Lofts site before constructionBefore constructionAugust 2026

Future vision

Where the structure is headed.

Architectural visualizations connect today's construction to the completed exterior and the warm timber character planned for shared interior spaces.

Architectural rendering of the completed Woodward Lofts exterior
Architectural rendering Exterior vision
Architectural rendering of the Woodward Lofts community room
Architectural rendering Community room
Architectural rendering of the Woodward Lofts lobby
Architectural rendering Lobby
AI-assisted concept film · 00:38Imagining the finished experience.

A speculative look at Woodward Lofts after completion, created from project imagery and architectural intent.

The journal continues

More chapters are still ahead.

Roof installation is the next scheduled chapter, with new flight coverage planned for September. Later updates will follow the enclosure, facade, interiors, and finished landscape.

Project team

Architecture + designKMA Studio
General contractorJEM Group
Mass timber integrationQuality Buildings
Photography + filmVisual Destinations